Data required for RCC Rate Analysis. Step 1: Estimation of Materials. Principal Components are: cement, sand, coarse aggregate & steel. Let mix design is M20 (1:1.5:3). Total volume of substances required is 1.54 m 3 for 1 m 3 of wet concrete. For 1 m 3 of m15 (1:2:4) grade . Sub total cost = cement + sand + aggregate = Rs. (2520 +775 + …
WhatsApp: +86 1822175507310m2 brickwork cost = INR 7384, so rate and cost per sq meter of brickwork = 7384/10= 738.4 = INR 740. Rate per square metre for brickwork is INR 740. conclusion :-1) Rate per cum for brickwork is INR 7384 & 2) Rate per sq m for brickwork is INR 740. And rate per cubic metre for brickwork is varying between INR 6000 to 8500 according to their ...
WhatsApp: +86 18221755073M 15 grade of concrete have cement, sand and aggregate ratio 1:2:4 in which one part is cement, 2 part is sand and 3 part is aggregate. For quantity and cost calculation for m15 grade of concrete we should follow following steps:- ◆ step 1, Dry volume :-we have wet volume of concrete is 1m3 and we have to convert we…
WhatsApp: +86 18221755073Today we will see how to prepare rate analysis for Reinforced Concrete (RCC) work. First step to rate analysis is the estimation of labour, materials, equipments and …
WhatsApp: +86 18221755073Cost of RCC beam construction in India: Rs 490 to 500 per square foot; Cost of RCC slab construction in India: Rs 180 to 200 per square foot; Cost of a 400 square foot RCC slab in India: Rs 72,000 to 80,000
WhatsApp: +86 18221755073In order to perform rate analysis for reinforced concrete, two steps are involved: 1- Estimation of number of labour and equipment, quantity of materials, …
WhatsApp: +86 18221755073The labour rate per cu ft. of the rubble soling work ranges from INR 9/- to 15/- depending upon the region. Let us consider an average rate of INR 12/- per cu ft. The total cost of labour for rubble soling = Total vol. of rubble soling in cu ft. x labour rate/ cu ft.
WhatsApp: +86 18221755073Rateanalysis for Brick work requires estimation of materials for Brick work, i.e. quantity of cement, sand and bricks required for 1m 3 for various proportions, i.e., Brick work 1:3, 1:4, 1:6, 1:8 etc. So, let us first calculate number of brick, quantity of cement and sand required for 1m 3 Brick work.
WhatsApp: +86 182217550731m3 = 35.3147 cuft. Convert Cuft into cubic meter. 0.417 Cuft = 0.417/35.3147 = 0.0118 m3. Wet volume of rcc slab = 0.0118 m3. In india, the typical Labour cost to build house is range from Rs. 210 to Rs. 220 per square foot. These includes labour cost approx Rs 140 to 150 per square foot for building a structure and around rs 70 per square foot for finishing …
WhatsApp: +86 18221755073Extra Overheads: Rs.950/Cum (This cost considered Including Transportation, Shifting, Water Electricity, Housekeeping, PF/ESIC.Etc.) In General Condition Lot of builders and Subcontractors are sublating this work on Sqft basis or Per Bag basis to Subcontractor or Concrete gang Who can do it on PCC Rs. 6.00/ Sqft and …
WhatsApp: +86 18221755073RCC RING BEAM AT TOP UNIT QTY RATE RS COST 20mm HBG graded metal cum 0.9 1405.04 1264.54 Sand cum 0.45 509.92 229.46 Cement Kgs 400 5.42 2169.60 1st Class Mason day 0.067 285.00 19.10 2nd Class Mason day 0.133 260 34.58 Mazdoor (Both Men and Women) day 2.5 215 537.50 Labour for centering Cum 1 1002 …
WhatsApp: +86 18221755073In the above format, we have given the format of M30 Concrete Ready Mix, but while preparing the actual rate analysis you should visit your site location and then visit the around raw material supplier's as well as nearby concrete plant. then you can get the actual cost of material and labor and after getting all the details from the site location you …
WhatsApp: +86 18221755073The rate per cubic meter for RCC (Reinforced Concrete Cement) construction can vary significantly based on several factors, including the region, project complexity, market conditions, and specific project requirements.
WhatsApp: +86 18221755073Concrete Calculator. Our online tools will provide quick answers to your calculation and conversion needs. On this page, you can calculate material consumption viz., cement, sand, stone gravel for the following concrete mix ratios - 1:1.5:3, 1:2:4, 1:3:6, 1:4:8, 1:5:10.
WhatsApp: +86 18221755073Here, l ef is the effective span; the thickness of the masonry is given by 't', and 'rho' is the density of masonry, i.e. 19.2kN/m2.. Self-weight of the lintel per metre length (kN/m) w = ( 1 x b x D ) x Density of RCC; Moment due to self-weight of Lintel, M 1 = wl 2 /8; Moment due to triangular load of masonry wall above the lintel, M 2 = Wl/6; Total Bending Moment M …
WhatsApp: +86 18221755073A m = B*d m + s*d m ²; d m = (d 1 +d 2) /2. The method to be used depends upon their suitability along with work type and the user. Some simple example of each for more illustration are given below. 1) Estimation of Earth work excavation calculations for building Sept 1:
WhatsApp: +86 18221755073Rate Analysis for RCC in 1:1.5:3 Rate Analysis for RCC in 1:1.5;3 is as follows. Rate Analysis for RCC in 1:1:2 ... For 10 cum:15.20cum 15.20/(Sum of Proportion) Therefore, 15.20cum/(1+1+2) Therefore, Value for 0ne (1) is ... Rate Analysis Estimate, Rate analysis, Rate Analysis for RCC Post navigation. 2. Rate Analysis for …
WhatsApp: +86 18221755073This article provides guidelines for the measurement including formulas for the calculation of quantities of various reinforced concrete works. Measurement of Reinforced Concrete Works: The Quantities can be rounded off to the nearest two decimals. Concrete in Structural members, such as columns, Beams and slabs shall each be measured …
WhatsApp: +86 18221755073Building Estimation Step by Step In Excel Sheet : 2024; Estimation for Building Works; House Construction Cost Calculator Excel Sheet; House Construction Cost Calculator Excel Sheet For Ground Floor(G.F.), G.F.+1, G.F.+2, G.F.+3, Tools. Web Stories; Rate Analysis >> Rate Analysis of Aluminum Door; Rate Analysis of Wooden …
WhatsApp: +86 18221755073Explanation: The quantity of cement required is [1/(1+2+4)] x 1.52 x 15 m 3 i.e. 3.257 m 3. SP weight of concrete is 1440 kg/m 3 and the weight of one cement bag is 50 kg. Therefore, the number of cement bags required for RCC (1:2:4) for 15 m 3 of work is 3.257 x 1440/50 = 93.8 bags.
WhatsApp: +86 18221755073Thus, for the proportion of mix considered, with one bag of cement of 50 kg, 0.1345 m 3 of concrete can be produced. We have considered an entrained air of 2%. Thus the actual volume of concrete for 1 cubic meter of compacted concrete construction will be = 1 -0.02 = 0.98 m 3. Thus, the quantity of cement required for 1 cubic meter of concrete ...
WhatsApp: +86 18221755073Measurements of RCC are taken net in the decimal system as fixed in its place, with dimensions to the nearest 0.01 m except for the thickness of the slab, which …
WhatsApp: +86 18221755073Precast RCC Rectangular Covers on drains of footpath of various sizes, of M-25 grade cement concrete for RCC work 1.40 sqm sand, filling the joints 2090.30 50 mm thick 2,926.0 0 17 Filling available excavated earth (excluding rock) in trenches, plinth, sides 37.00 cum cement 112. 40 20 60mm thick factory made concrete 4,159.0 0 of foundations
WhatsApp: +86 18221755073Rate analysis of Brickwork - Free Excel Download. Skip to content. ... Rate per m. cum = 63379.94 / 10 = Rs. 6337.99/ cu. meter. Watch Video. Download Brick Masonry Excel Sheet. ... Design of RCC; Estimate and Valuation; Foundation; Hydrology; Irrigation; Practical Knowledge; Railway; Sanitary and Hydrology;
WhatsApp: +86 18221755073The rate analysis is not an easy thing, we have to squeeze our mind and today we are going to discuss the rate analysis of concrete with example calculation. Construction; ... Estimation of Materials. Assume We need …
WhatsApp: +86 18221755073Rateanalysis for steel bar requires estimation of materials for Steel work, i.e. quantity of Steel, and binding wire required for 1kg steel bar work for column, beam, slab steel bar work, i.e. So, we know that the quantity of steel bar is 1 kg so we can find out the require material for cutting, binding, and fixing a steel work in a place.
WhatsApp: +86 18221755073The reinforced concrete features combined the strength of cement and steel bars which are the basic components of a modern structural design. RCC is one of the widely used building materials that can be used for creating ... you can get a rough estimate with a simple RCC roof slab steel calculation formula. To find out the exact …
WhatsApp: +86 18221755073Estimation of steel reinforcement quantity is a necessary step in calculating cost of RCC structure along with other building materials as per construction drawing. Accurate calculation of reinforcement in the …
WhatsApp: +86 18221755073Learn the detailed steps for rate analysis for Reinforced Concrete (RCC) work. To start with, you have to first make estimation of labour, materials, equipments and various items for specific quantity of reinforced concrete.
WhatsApp: +86 18221755073Build a website. Sell your stuff. Write a blog. And so much more.
WhatsApp: +86 18221755073Quantity of reinforcement per cubic meter and its suitable sizes for different reinforced concrete construction is discussed. Reinforcement is required for reinforced concrete members such as footings, beams, columns, slabs, lintels etc. Estimation of reinforcement quantity is required prior to tendering stage to calculate approximate cost of ...
WhatsApp: +86 18221755073The analysis and estimation of retaining walls using geogrid are the ... Description Unit Rate (Rs. / Unit) Quantity Amount (Rs) Earth Work Excavation cum. 152.5 9 1372.5 ... 1299 5 6495 Back Filling (murum) in Reinforced Zone cum 200 33 6600 Geogrid Sq m. 140 48 6720 Total 21736.19 (Table 2 Cost Analysis of Geogrid Retaining Wall of 6m height)
WhatsApp: +86 18221755073Strength of RCC is defined as compressive strength after 28 days, expressed as M15, M20, where M stands for Mix and 15 stands for 15 N/mm 2 (n/mm 2 must be read as 'Newton's per millimeter Cubed) compressive strength at 28 days. The proportions of materials (cement, sand, coarse aggregate) for nominal mix/design mix concrete that are normally …
WhatsApp: +86 18221755073So, for 10 Cu.m concrete, requirement of steel = 0.02 ton x 10 cu.m. = 0.20 ton = 200 kg. Labor costs for Rate Analysis of Concrete. As CPWD Mate per cu.m. 0.27 of day bhisti, per cu.m.0.6-day coolie, per cu.m. 0.05-day Mason -2nd, per cu.m. 0.05-day mason 1st, per cu.m. 0.04-day mate. Extra Changes in rate analysis will be as per the following.
WhatsApp: +86 18221755073Cost of sand for 1 m 3 = As per the present market rate, the cost of 1 m 3 of sand is taken as Rs: 1200 = 0.42 X 1200 = 504 Rs. Cost of course aggregate for 1 m 3 = As per the present market rate, the cost of 1m 3 of course aggregate is taken as Rs.1500 = 0.84 X 1500 = 1260 Rs. Therefore, the total cost for 1m3 of M – 20 concrete is